Results for Vila Praia de Âncora in Portugal
Sports area fenced and synthetic floors.
Enclosure sealed cement flooring MultiSport. It was inaugurated in 2001.
Sealed concrete-floored space, with markings for the practice of various disciplines.
Multi-sport synthetic floor sealed enclosure and markings for various modes.
Set of indoor and outdoor pools. The outdoor pool is open from June to September.
Building with a heated indoor pool and two outdoor pools, one for adults and one for children.
An outdoors swimming pool located in the sports complex of Codessais.
A large, glassed space with two interior swimming pools and a stand with 72 seats.
Indoor pool (heated) with support infrastructures.